Post by ProHorn CompMetal on Jan 23, 2008 10:41:48 GMT -5
Ultima ratio [L.], the last reason or argument; the last resort.
Phase 0: Desolation - Initial Status - Feb, 2007
Unmodified 1989 Jeep Wrangler YJ Islander
School Bus Yellow over Smurf Blue exterior
Grey interior
Phase 1: Resuscitation - Complete - April, 2007
Engine repaired to pass emissions
New EGR valve
New Carter BBD stepper motor
New O2 sensor
New exhaust system
Exterior repainted
Gunmetal base
Flat black accents
Interior reworked
Carpet removed
Tub coated with black Herculiner
New seat covers
Shift knobs replaced with Hurst
Back seat and mounting points removed
Top replaced
Full soft top for winter
Bikini/Windjammer/Tonneau combo for summer
Windshield mounted side mirrors to facilitate door removal
Body damage repaired
New windshield, frame, and hinges
Body armor
Features repaired
Heater controls
Speakers
Ignition lock cylinder
Phase 2: Elevation - Complete - July, 2007
Lift
4" Skyjacker spring lift
1" heavy duty shackle lift
33x12.5R15 Mud Terrains
Brake/fuel/vacuum system repairs
New fuel hard and soft lines
New brake hard and soft lines (soft lines replaces with braided steel)
New vacuum lines
Smittybilt 6" pocket style fender flares
Phase 3: Salvation - Complete - Dec, 2007
Warn M8000 winch
Tree saver strap
Gloves
Pulley
Hi-Lift jack
On-board air
ViAir 350c compressor
2.5 gallon air tank
*This item is currently classified*
Smittybilt rear bumper with tire carrier
Removable trailer hitch and wiring
Hitch plug with D ring for recovery
Tool box for recovery supplies, locked and bolted down
Survival kit
Tire repair kit
Starting fluid
Tire iron/prybar
Orange flag
Phase 4: Detonation - Complete - Jan, 2008
High output alternator
Weber DGEV 32/36 Carburetor
GM HEI ignition distributor
Fuel/Air Mixture Gauge
Battery cutout switch
All unnecessary engine components removed
Carter BBD carburetor
Ignition module
Ignition coil
Distributor
Pulse Air system
Computer
Computer diagnostic ports
Air conditioner and rear defroster relays
Vacuum switches
Vacuum solenoids
Vacuum reservoir
Deceleration valve
1/2 mile of wiring
1/4 mile of vacuum lines
Phase 5: Rotation - In Progress - Scheduled Feb, 2008
New rear axle: Ford 8.8
Upgraded front axle: Superior Super 30
New gears: 4.56
Lockers: Front and rear OX
Phase 6: Observation - In Progress - Scheduled March, 2008
Interior lighting
White LED footwell lights
White LED cargo area lights
White LED under-hood light
Custom dash
CJ style black flat steel dash
AutoMeter Phantom Gauges
Speedometer
Tachometer
Fuel Quantity
Oil Pressure
Water Temp
Voltmeter
On-board Air Pressure
Fuel/Air Mixture
Manifold Vacuum
Ported Vacuum
Phase 7: Machination - Planned - Unscheduled
New transmission
Remove Peugeot transmission
Replace with AX/15
New transfer case
Remove NP-231
Replace with Dana 300
Dana 300 flip kit
Dana 300 twin stick kit
Dana 300 4:1 kit
Phase 8: Resurrection - Planned - Unscheduled
Frame
Repair rot or replace
Possible new galvanized steel frame
Body
Repair rot or replace
Possible new aluminum tub
Engine Block
Repair blow-by or replace
Possible remanufactured block
Phase 9: Unnamed - Unplanned - Unscheduled
Phase 0: Desolation - Initial Status - Feb, 2007
Unmodified 1989 Jeep Wrangler YJ Islander
School Bus Yellow over Smurf Blue exterior
Grey interior
Phase 1: Resuscitation - Complete - April, 2007
Engine repaired to pass emissions
New EGR valve
New Carter BBD stepper motor
New O2 sensor
New exhaust system
Exterior repainted
Gunmetal base
Flat black accents
Interior reworked
Carpet removed
Tub coated with black Herculiner
New seat covers
Shift knobs replaced with Hurst
Back seat and mounting points removed
Top replaced
Full soft top for winter
Bikini/Windjammer/Tonneau combo for summer
Windshield mounted side mirrors to facilitate door removal
Body damage repaired
New windshield, frame, and hinges
Body armor
Features repaired
Heater controls
Speakers
Ignition lock cylinder
Phase 2: Elevation - Complete - July, 2007
Lift
4" Skyjacker spring lift
1" heavy duty shackle lift
33x12.5R15 Mud Terrains
Brake/fuel/vacuum system repairs
New fuel hard and soft lines
New brake hard and soft lines (soft lines replaces with braided steel)
New vacuum lines
Smittybilt 6" pocket style fender flares
Phase 3: Salvation - Complete - Dec, 2007
Warn M8000 winch
Tree saver strap
Gloves
Pulley
Hi-Lift jack
On-board air
ViAir 350c compressor
2.5 gallon air tank
*This item is currently classified*
Smittybilt rear bumper with tire carrier
Removable trailer hitch and wiring
Hitch plug with D ring for recovery
Tool box for recovery supplies, locked and bolted down
Survival kit
Tire repair kit
Starting fluid
Tire iron/prybar
Orange flag
Phase 4: Detonation - Complete - Jan, 2008
High output alternator
Weber DGEV 32/36 Carburetor
GM HEI ignition distributor
Fuel/Air Mixture Gauge
Battery cutout switch
All unnecessary engine components removed
Carter BBD carburetor
Ignition module
Ignition coil
Distributor
Pulse Air system
Computer
Computer diagnostic ports
Air conditioner and rear defroster relays
Vacuum switches
Vacuum solenoids
Vacuum reservoir
Deceleration valve
1/2 mile of wiring
1/4 mile of vacuum lines
Phase 5: Rotation - In Progress - Scheduled Feb, 2008
New rear axle: Ford 8.8
Upgraded front axle: Superior Super 30
New gears: 4.56
Lockers: Front and rear OX
Phase 6: Observation - In Progress - Scheduled March, 2008
Interior lighting
White LED footwell lights
White LED cargo area lights
White LED under-hood light
Custom dash
CJ style black flat steel dash
AutoMeter Phantom Gauges
Speedometer
Tachometer
Fuel Quantity
Oil Pressure
Water Temp
Voltmeter
On-board Air Pressure
Fuel/Air Mixture
Manifold Vacuum
Ported Vacuum
Phase 7: Machination - Planned - Unscheduled
New transmission
Remove Peugeot transmission
Replace with AX/15
New transfer case
Remove NP-231
Replace with Dana 300
Dana 300 flip kit
Dana 300 twin stick kit
Dana 300 4:1 kit
Phase 8: Resurrection - Planned - Unscheduled
Frame
Repair rot or replace
Possible new galvanized steel frame
Body
Repair rot or replace
Possible new aluminum tub
Engine Block
Repair blow-by or replace
Possible remanufactured block
Phase 9: Unnamed - Unplanned - Unscheduled